12×12 cubic pod I started about one year ago is now completed and my kids are moved in.
Ideas in behind this is that I can complete all interior feature include electric wiring and move and attach to the new house I will be building. Three pod in raw now but I am not sure how I can pass the building inspection. Not enough thinking.
Build high ceiling and place kind of loft will gain good amount of floor space. For kids, this would be bed. I also placed large storage compartment which is connected from both bed space that is using as play space. Lego’s and puzzles are all spread out but out of my sight so they can do whatever they want to do without me telling them to clean up.
Large sized windows were bay out and use the space as nook, electric floor heating in place with cork floor on top. Folding sliding door really opens up space so tightly 12×12 pod does not feel so closed up.
At Daizen, we ensure client expectations and understanding of processes are met through all phases of our work, from structural design and engineering to fabrication of timber frames and assembly and installation.